Hot spot remediation of a CFC underground load using large-hole drilling including disposal and groundwater purification on the site of a former chemical cleaning facility
Remediation by replacement borings
Honeycomb Excavation
Demolition, soil remediation, earthwork and sheeting work
Demolition of the former ZV tank farm with expansion of fuel tanks and renovation through soil replacement. Disposal of the building fabric and the excavated soil. Dewatering with water purification.
Special foundation engineering, earthworks, process engineering, waste disposal
Removal of underground foundations and obstacles using large-hole drilling in an area containing tannery waste suspected of being contaminated with anthrax