| Location of performance / Site: | Ob. Walke, Backnang, Baden-Wuerttemberg, Germany, Europe |
|---|---|
| Period: | Aug 2021 - Mar 2022 |
| Safety precautions: | Personal protective equipment (PPE), Black and white facility |
|---|
| Excavation: | Conventional soil replacement, Underground demolition, Rearrangement |
|---|---|
| Cubature: | 16000 m³ |
| Provision of excavated material: | Direct loading, unpaved foil-protected area, Temporary storage on the construction site |
| Construction and demolition waste: | Soil and stones without dangerous substances, Soil and stones containing dangerous substances |
|---|---|
| Transport: | Saddle, Truck |
| Tonnage: | 35000 to |
| Disposal: | Provision for disposal, Recycling - installation, Recovery - material recovery |
| Treatment methods: | Landfill |
| Loading category: | DK 0, DK I, DK II |
| Excavation method: | Conventional with loader and excavator |
|---|---|
| Tonnage: | 32,000 t |
| Fields of application: | Excavations |
| Soil type: | Silts |
|---|---|
| Methods: | Mill |
| Binder: | Adapted recipe |
| Area: | 3500 m² |