| Location of performance / Site: | Flughafen Berlin Brandenburg (BER) „Willy Brandt“ Willy-Brandt-Platz 2, Schönefeld, Brandenburg, Germany, Europe |
|---|---|
| Period: | Nov 2022 - Feb 2024 |
| Responsible company location: | BAUER Resources GmbH, Bereich Bauer Umwelt, Standort Roßwein |
| Safety precautions: | Devices with protective ventilation, Multi-gas detector, Personal protective equipment (PPE), PID measurements, Black and white facility, Dust measurement |
|---|
| Safety precautions: | Suction, Aeration, Fog system, Hydraulically lockable wheel loader bucket, Air extraction on the drill pipe, Wheel washing system, Black and white facility, Boot washer |
|---|
| Diameter replacement boring: | DN 1500 |
|---|---|
| Excavation: | Replacemt drilling, Conventional soil replacement, Underground demolition, Conventional excavation |
| Exchange depth: | 9 m |
| Water treatment: | Sedimentation basin, Activated carbon filter, Stripper column |
| Conveyor flow: | 12 m³/h |
|---|
| Construction and demolition waste: | Asbestos-containing building materials (17.06.05), Construction and demolition waste without hazardous substances, Soil and stones containing dangerous substances, other construction and demolition wastes containing dangerous substances |
|---|---|
| Transport: | Gas-tight container |
| Tonnage: | 34400 to |
| Disposal: | Provision for disposal, Floor washing |
| Treatment methods: | Biological soil treatment, Thermal soil treatment, Washing |
| Loading category: | > Z 2 LAGA Soil |
| Methods of dewatering: | Vacuum lances, Water elevation |
|---|---|
| Type of dewatering: | Closed |
| Applications: | Downstream fuse |
| Duration: | 23 Weeks |