| Location of performance / Site: | Frankenstraße, Salz, Bavaria, Germany, Europe |
|---|---|
| Period: | May - Oct 2016 |
| Responsible company location: | BAUER Resources GmbH, Bereich Bauer Umwelt, Standort Schrobenhausen |
| Project Partners: |
|---|
| Equipment: | Excavator, Wheel loaders, Rolls |
|---|---|
| Earthworks: | Road bed excavation |
| Excavation method: | Conventional with loader and excavator |
| Filling materials: | Gravel |
| Fields of application: | Soil remediation |
| Type of dewatering: | Open |
|---|---|
| Water treatment: | Sedimentation basin, Activated carbon filter |
| Pollutants: | Gasoline, diesel, heating oil (TPH), PAH, Phenols / Chlorophenols, Heavy metals |
|---|---|
| Transport: | Saddle planned |
| Tonnage: | 1350 to |
| Disposal: | Recycling - installation, Landfill |
| Loading category: | Z 1.2 LAGA Soil, DK I |
| Conveyor flow: | 10 l/s |
|---|
| Safety precautions: | Personal protective equipment (PPE), PID measurements, Black and white facility |
|---|
| Excavation: | Conventional soil replacement, Underground demolition |
|---|---|
| Exchange depth: | 5 m |
| Provision of excavated material: | unpaved foil-protected area |
| Construction and demolition waste: | Construction and demolition waste without hazardous substances, Soil and stones without dangerous substances, other construction and demolition wastes containing dangerous substances |
|---|