| Location of performance / Site: | Sandershäuser Str. 59, Kassel, Hesse, Germany, Europe |
|---|---|
| Period: | Jan - Apr 2022 |
| Responsible company location: | BAUER Resources GmbH, Bereich Bauer Umwelt, Standort Hamburg |
Complete service for the remediation of a CFC subsoil pollution by means of replacement drillings:
| Respiratory protection: | Gas filter |
|---|---|
| Safety precautions: | Personal protective equipment (PPE), PID measurements, Black and white facility |
| Pollutants: | CHC / HVOC, PAH |
|---|
| Diameter replacement boring: | DN 1500 |
|---|---|
| Excavation: | Replacemt drilling, Conventional soil replacement, Soil replacement in tent cover |
| Exchange depth: | 8 m |
| Area: | 460 m² |
| Cubature: | 2900 m³ |
| Cubature: | 5,200 t |
| Provision of excavated material: | paved area (asphalt), Soil treatment center |
| Water treatment: | Sedimentation basin, Activated carbon filter, Sand filter |
| Delivery flow water: | 10 m³/h |
| Construction and demolition waste: | Soil and stones without dangerous substances, Soil and stones containing dangerous substances, Soil and rocks under AVV 170504 |
|---|---|
| Transport: | Container, Saddle planned |
| Tonnage: | 2942 to |
| Disposal: | Recovery - material recovery |
| Treatment methods: | Biological soil treatment, Conditioning, Separating |
| Loading category: | > Z 2 LAGA Soil |