Remediation by replacement borings
Demolition of the former ZV tank farm with expansion of fuel tanks and renovation through soil replacement. Disposal of the building fabric and the excavated soil. Dewatering with water purification.
Hot spot remediation of a CFC underground load using large-hole drilling including disposal and groundwater purification on the site of a former chemical cleaning facility
Turnkey excavation pit
Honeycomb Excavation
Demolition, soil remediation, earthwork and sheeting work
Kiel, Max-Eyth-Strasse, Christian Albrechts University of Kiel, new building for the Institute of Physiology. Creation of an excavation pit on a former household waste dump