| Location of performance / Site: | Thomas-Wimmer-Ring, München, Bavaria, Germany, Europe |
|---|---|
| Period: | Apr 2017 - Jul 2020 |
| Responsible company location: | BAUER Resources GmbH, Bereich Bauer Umwelt, Standort Schrobenhausen |
| Equipment: | Excavator, Wheel loaders, Bulldozers, Backhoe excavator |
|---|---|
| Earthworks: | Excavation, Road bed excavation, Building pit, Subgrade |
| Excavation method: | Conventional with loader and excavator, Excavation in shoring boxes, Underground excavation |
| Earthwork mass: | 90000 m³ |
| Tonnage: | 180,000 t |
| Excavation depth & GOK: | 14 m |
| Filling materials: | Gravel |
| Fields of application: | Excavations, Tunneling |
| Pollutants: | Gasoline, diesel, heating oil (TPH), Organic pollution as TOC, PAH |
|---|
| Construction and demolition waste: | Dredged material without dangerous substances, Concrete (17.01.01), Soil and stones without dangerous substances, Tiles, bricks and ceramics (17.01.03), Soil and rocks under AVV 170504 |
|---|---|
| Transport: | Saddle, Saddle planned |
| Tonnage: | 30000 to |
| Disposal: | Provision for disposal, Recycling - installation, Landfill |
| Treatment methods: | Biological soil treatment, Conditioning |
| Loading category: | Z0 LAGA Soil, Z 1.1 LAGA Soil, Z 1.2 LAGA Soil, Z 2 LAGA Soil, DK 0, DK I, DK II, RW 2 |
| Dismantling amount: | Complete dismantling |
|---|---|
| Dismantling process: | Selective dismantling |
| Type of building: | Underpass |
| Building volume: | 4,000 m³ |
| Amount demolition materials: | 4,000 m³ |