München, Thomas-Wimmer-Ring

Service Provider

BAUER Resources GmbH

BAUER-Straße 1 / 86529 Schrobenhausen
Earth-Moving Work & Development
Earthwork Properties
Equipment: Excavator, Wheel loaders, Bulldozers, Backhoe excavator
Earthworks: Excavation, Road bed excavation, Building pit, Subgrade
Excavation method: Conventional with loader and excavator, Excavation in shoring boxes, Underground excavation
Earthwork mass: 90000 m³
Tonnage: 180,000 t
Excavation depth & GOK: 14 m
Filling materials: Gravel
Fields of application: Excavations, Tunneling
Soil Remediation Work
Soil Remediation Pollutants
Soil Remediation Work
Disposal Properties
Construction and demolition waste: Dredged material without dangerous substances, Concrete (17.01.01), Soil and stones without dangerous substances, Tiles, bricks and ceramics (17.01.03), Soil and rocks under AVV 170504
Transport: Saddle, Saddle planned
Tonnage: 30000 to
Disposal: Provision for disposal, Recycling - installation, Landfill
Treatment methods: Biological soil treatment, Conditioning
Loading category: Z0 LAGA Soil, Z 1.1 LAGA Soil, Z 1.2 LAGA Soil, Z 2 LAGA Soil, DK 0, DK I, DK II, RW 2
Dismantling Work
Dismantling Work Properties
Dismantling amount: Complete dismantling
Dismantling process: Selective dismantling
Type of building: Underpass
Building volume: 4,000 m³
Amount demolition materials: 4,000 m³
Details about the services provided
  • Earthworks

    Rock excavation

    Removal of rock-like soils underground

  • Dismantling Work

    Underground dismantling

    Demolition of a pedestrian tunnel
    Removal of a backfilled shoring box, partly underground

Client

WÖHR + BAUER Parking GmbH

Hildegardstraße 2
80539 München
Bavaria, Germany, Europe
Reference Project Presentation
Press Review
Share Reference

More references by BAUER Resources GmbH