Turnkey excavation pit
Hot spot remediation of a CFC underground load using large-hole drilling including disposal and groundwater purification on the site of a former chemical cleaning facility
Demolition of the former ZV tank farm with expansion of fuel tanks and renovation through soil replacement. Disposal of the building fabric and the excavated soil. Dewatering with water purification.
Special foundation engineering, earthworks, process engineering, waste disposal
Kiel, Max-Eyth-Strasse, Christian Albrechts University of Kiel, new building for the Institute of Physiology. Creation of an excavation pit on a former household waste dump
Demolition, soil remediation, earthwork and sheeting work
For the HIM ASG, the BRE BMU division is carrying out a soil stabilization measure on the site of the former Butzbach cable recycling company in the Butzbach-Ebersgöns district, Am Heinrichsberg.