| Location of performance / Site: | St.-Anna-Straße 25, München, Bavaria, Germany, Europe |
|---|---|
| Period: | May 2021 - Dec 2022 |
| Responsible company location: | BAUER Resources GmbH, Bereich Bauer Umwelt, Standort Schrobenhausen |
| Respiratory protection: | Particle filter |
|---|---|
| Safety precautions: | Black and white facility |
| Safety precautions: | Enclosure with negative pressure, Barriers, Black and white facility |
|---|
| Provision of excavated material: | unpaved foil-protected area |
|---|
| Construction and demolition waste: | Asbestos-containing building materials (17.06.05), Construction and demolition waste without hazardous substances, Construction and demolition waste containing PCB, Wood (17.02.01), Soil and rocks under AVV 170504, other construction and demolition wastes containing dangerous substances |
|---|---|
| Transport: | Container, Saddle, Big bags on truck saddle |
| Disposal: | Landfill |
| Treatment methods: | Landfill |
| Loading category: | Z0 LAGA Soil, Z 1.1 LAGA Soil, Z 1.2 LAGA Soil, Z 2 LAGA Soil, DK 0 |
| Equipment: | Excavator, Backhoe excavator, Telescopic excavator |
|---|---|
| Earthworks: | Excavation, Building pit |
| Excavation method: | Conventional with loader and excavator |
| Dismantling amount: | Complete dismantling |
|---|---|
| Dismantling process: | Selective dismantling |
| Type of building: | Skyscrapers |
| Building volume: | 5,000 m³ |