| Location of performance / Site: | Alexisweg, München, Bavaria, Germany, Europe |
|---|---|
| Period: | Oct 2020 - Apr 2022 |
| Responsible company location: | BAUER Resources GmbH, Bereich Bauer Umwelt, Standort Schrobenhausen |
| Equipment: | Excavator |
|---|---|
| Earthworks: | Excavation, Retaining wall |
| Excavation method: | Conventional with loader and excavator |
| Earthwork mass: | 30000 m³ |
| Tonnage: | 60,000 t |
| Excavation depth & GOK: | 5 m |
| Fields of application: | Soil remediation |
| Fields of application: | Civil engineering |
|---|---|
| Application areas: | Mine temporary support system |
| Shoring types: | Berlin construction, Sheet pile wall |
| Shoring area: | 500 m² |
| Pollutants: | PAH |
|---|