Turnkey excavation pit
Special foundation engineering, earthworks, process engineering, waste disposal
For the HIM ASG, the BRE BMU division is carrying out a soil stabilization measure on the site of the former Butzbach cable recycling company in the Butzbach-Ebersgöns district, Am Heinrichsberg.
Demolition, soil remediation, earthwork and sheeting work
Hot spot remediation of a CFC underground load using large-hole drilling including disposal and groundwater purification on the site of a former chemical cleaning facility
Demolition of the former ZV tank farm with expansion of fuel tanks and renovation through soil replacement. Disposal of the building fabric and the excavated soil. Dewatering with water purification.
Kiel, Max-Eyth-Strasse, Christian Albrechts University of Kiel, new building for the Institute of Physiology. Creation of an excavation pit on a former household waste dump
Removal of underground foundations and obstacles using large-hole drilling in an area containing tannery waste suspected of being contaminated with anthrax