Kiel, Max-Eyth-Strasse, Christian Albrechts University of Kiel, new building for the Institute of Physiology. Creation of an excavation pit on a former household waste dump
Removal of underground foundations and obstacles using large-hole drilling in an area containing tannery waste suspected of being contaminated with anthrax
For the HIM ASG, the BRE BMU division is carrying out a soil stabilization measure on the site of the former Butzbach cable recycling company in the Butzbach-Ebersgöns district, Am Heinrichsberg.
Demolition, soil remediation, earthwork and sheeting work