Soil Remediation -
referencedeck
.com
Login
Sign Up
English
EN
Switch language
English
Deutsch
Overview
Dashboard
Search Results
Watchlists
Communications
Industries
Industries
Craft
Building and Renovation
Decorating and Furnishing
Event, Leisure and Travel
Design, Advertising and Media
IT Business and Technology
Consulting, Finance and Law
Health, Sports and Wellness
Job, Education and Social
My References
Add Company Profile
Industry:
Building and Renovation
Civil Engineering
(x)
Earth-Moving Work
(x)
Soil Remediation Work
(x)
Refine Your Results
Location
München
(1)
Nürnberg
(1)
Munich
Schweinfurt
Berlin
Mainz
Segnitz
Kitzingen
Ingolstadt
Schonungen
Marktredwitz
Ebelsbach
Suzhou
Ottobeuren
Kalchreuth
Karlsruhe
Kierspe
Salz
Wackernheim
Kiel
Offenbach am Main
Project Period
Anytime
(1)
since 2026
since 2024
since 2021
(1)
Fields of Work
Occupational safety and emission protection
(2)
Disposal work
(1)
In-situ remediation
(1)
Ex-situ remediation
Soil remediation work
more
Services
Planning
(2)
Implementation
(2)
Exploitation
(1)
Consulting
(1)
Execution
(1)
Exploration
(1)
Monitoring
Health and safety coordination
SiGe coordination BGR 128
Weaponry monitoring
Designation of a qualified person
Disposal concept
Invitation of Tenders
Transport
Treatment
Declaration analysis
Expert support
Sampling
Waste law declaration
Packaging
Dangerous goods transport
Water purification
Waste Management
eANV
Disposal
Construction of the remediation plant
Operation of the remediation plant
Occupational safety and emission protection
Construction supervision
Concept creation
Professional support
Public Relations
Pedological construction supervision
more
Products
Steam-Enhanced-Extraction (SEE) with air-co-injection - TUBA-Verfahren
Thermal Conductive Heating (TCH) - THERIS-method
Cubature
< 1000 m³
1000 - 3000 m³
3000 - 10000 m³
10000 - 50000 m³
> 10000 m³
> 50000 m³
more
Area
< 100 m²
100 - 1000 m²
1000 - 5000 m²
5000 - 10000 m²
10000 - 30,000 m²
> 30000 m²
more
Surface sealing
Asphalt sealing
Mineral sealing
Restoration layer
Excavation-damaged zone
Bentonite mats
Drainage mat
Support and leveling layer
Water balance layer
Water storage layer
Soil air drainage
Gas-tight membrane
Geosynthetic clay liner
Combined sealing
Plastic sheets for waterproofing
Mine
System base sealing
Impermeable soil layer (clay)
more
Vertical shielding
Fountain gallery
Diaphragm walls
Asphalt
Secant pile wall
Funnel-and-Gate
High pressure injection (HDI) wall
Mixed-in-place walls
Drainage wall
Rammed diaphragm walls
Injection wall
Trench wall combi-sealing
Narrow walls
Sheet pile walls
more
Horizontal sole sealing
Injection screen
Jet grouting brine
Gallery
Respiratory protection
Particle filter
(2)
Combination filter
(1)
Self-supporting isolators
Gas filter
Hose-based isolators
more
Safety precautions
Personal protective equipment (PPE)
(2)
Black and white facility
(2)
PID measurements
(2)
Devices with protective ventilation
(1)
Enclosure with negative pressure
(1)
Enclosure with exhaust air system
Multi-gas detector
Dust measurement
Full protection
Working in contaminated areas according to DGUV-R 101-004
Emission control measures
more
Safety precautions
Black and white facility
(2)
Boot washer
(2)
Wheel washing system
(1)
Suction
(1)
Enclosure with negative pressure
(1)
Fog system
Aeration
Housing
Hydraulically lockable wheel loader bucket
Fire extinguishing system
Air extraction on the drill pipe
Barriers
Ventilation
Air extraction in the loading area
more
Pollutants
Gasoline, diesel, heating oil (TPH)
(2)
PAH
(2)
Arsenic
(1)
Artificial mineral fiber (KMF)
(1)
Asbestos
(1)
Asphalt
(1)
CHC / HVOC
(1)
Heavy metals
(1)
Tar oils / Tar
(1)
BTEX
Iron
Polychlorinated biphenyls (PCB)
Phenols / Chlorophenols
Copper
Manganese
MKW
Trichloroethene
Ammonium (NH4)
Lead
Perchlorethylene (PERC)
Perfluorinated alkyl substances (PFAS)
Per- and Polyfluoroalkyl Substances (PFAS)
Vinyl chloride - Chloroethene (VC)
Chrome
Cis-1,2-Dichloroethene
Cyanide
Dioxins
Cadmium
MTBE
Oil phase
Organic pollution as TOC
more
Diameter replacement boring
DN 1500
DN 1200
DN 900
DN 1800
DN 2000
DN 2300
more
Excavation
Conventional soil replacement
Replacemt drilling
Underground demolition
Conventional excavation
Rearrangement
Honeycomb method
Soil replacement in tent cover
Slide rail shoring
Sheet piling box
Tank recovery
Bored piles
more
Exchange depth
< 5 m
6 m
4 m
5 - 10 m
10 - 15 m
15 - 20 m
> 20 m
more
Area
< 100 m²
100 - 500 m²
500 - 1.000 m²
1,000 - 5,000 m²
5,000 - 10,000 m²
more
Cubature
< 1000 m³
1000 - 3000 m³
3.000 - 6.000 m³
6,000 - 10,000 m³
> 10000 m³
more
Provision of excavated material
Direct loading
paved area (asphalt)
Temporary storage on the construction site
unpaved foil-protected area
paved area in enclosure (tent)
Soil treatment center
paved area in enclosure (hall)
paved area (mortar)
Staging area secured
Interim storage
more
Conveyor flow exhaust air treatment
< 5 m³/h
< 5 m³/h
10 - 15 m³/h
15 - 20 m³/h
> 20 m³/h
more
Water treatment
Activated carbon filter
Sedimentation basin
Sand filter
Stripper column
Precipitation / flocculation
Sludge press
Leaching
Biological purification stage
EcoVert
External wastewater treatment plant
Cooling
Light liqid separator
Neutralization
Phase recovery
more
Delivery flow water
< 5 m³/h
5 - 10 m³/h
10 - 15 m³/h
15 - 20 m³/h
20 - 25 m³/h
25 - 50 m³/h
50 - 75 m³/h
more
In-situ method
Soil vapor extraction
(1)
Pump and Treat
(1)
In-situ stripping
(1)
Surface coverage
Bio-remediation
Bioscreen
Bioventing
Steam injection
Enhanced Natural Attenuation (ENA)
Microbiological in-situ remediation
Monitored Natural Attenuation (MNA)
Phytoremediation
Reactive systems
THERIS (solid heat sources)
TUBA (steam-air injection)
Bioslurping
Soil washing
Cosolvent Flushing
Cut-off wall
Sealing wall lift reactor
Dual phase extraction
Electrokinetic methods
Enhanced Oil Recovery (EOR)
Hydro airlift / bio airlift
Hydro shock procedure
Immobilization
In-situ chemical oxidation
Coaxial groundwater aeration
MIP procedure
Vacuum evaporator fountain
more
Restoration depth
0 - 5 m
5 - 8 m
(1)
8 - 12 m
> 12 m
Cubature
< 1000 m³
1000 - 3000 m³
3000 - 10000 m³
(1)
> 10000 m³
Area
< 100 m²
100 - 1000 m²
1000 - 5000 m²
5.000 - 10.000 m²
10000 -30000 m²
> 30000 m²
more
Conveyor flow
< 5 m³/h
5 - 10 m³/h
10 - 15 m³/h
15 - 20 m³/h
20 - 25 m³/h
25 - 50 m³/h
50 - 75 m³/h
more
Conveyor height
< 5 m
5 m - 7,5 m
7,5 m- 10 m
10 m - 15 m
15 m - 20 m
more
Steam capacity in kg/h
100
200
300
400
600
700
1.000
6,000
10.000
more
Construction and demolition waste
Concrete (17.01.01)
(1)
Tiles, bricks and ceramics (17.01.03)
(1)
Wood (17.02.01)
(1)
Wood, glass, plastics containing dangerous substances
(1)
Coal tar-containing bituminous mixtures (17.03.01)
(1)
Bitumen mixtures not tarry (17.03.02)
(1)
Coal tar and tarry products (17.03.03)
(1)
Soil and stones containing dangerous substances
(1)
Soil and stones without dangerous substances
(1)
Track ballast without dangerous substances
(1)
Insulating material containing asbestos
(1)
Insulating material containing dangerous substances
(1)
Insulation material without dangerous substances
(1)
Asbestos-containing building materials (17.06.05)
(1)
Gypsum-based building materials containing hazardous substances
(1)
other construction and demolition wastes containing dangerous substances
(1)
Construction and demolition waste without hazardous substances
(1)
Soil and rocks under AVV 170504
(1)
Dredged material containing dangerous substances
Bricks (17.01.02)
Dredged material without dangerous substances
Construction and demolition waste containing PCB
Glass (17.02.02)
Infectious waste (180103)
Construction and demolition waste containing mercury
Gypsum-based building materials without hazardous substances
Track ballast containing dangerous substances
Plastic (17.02.03)
Thermal recovery
more
Transport
Capped containers
(1)
Truck
(1)
Saddle
(1)
Saddle planned
(1)
Big bags on truck saddle
(1)
Container
Train
Gas-tight container
Dangerous goods transport
Saddle planned, waterproof
Ship
Lidded barrels
Barrel loading
capped truck troughs
Vaccum truck
more
Tonnage
< 1000 to
1000 - 3000 to
3000 - 6000 to
6000 - 10,000 to
10,000 - 15,000 to
15,000 - 20,000 to
20,000 - 30,000 to
> 30.000 to
(1)
more
Disposal
Landfill
(1)
Recycling - installation
(1)
Provision for disposal
(1)
Recovery - material recovery
High temperature incineration
Underground offset
Floor washing
Thermal desorption
Landfill - Fine fraction
Energy recovery - films, plastics and wood
Underground landfill
Recovery - Recycling of metals
Recycling to Greenbeton
Recycling - thermal recycling
more
Treatment methods
Biological soil treatment
(1)
Conditioning
(1)
Separating
(1)
Sieving
(1)
Landfill: Monolandfill
(1)
Breaking / Sieving
Landfill
Interim storage
Washing
Thermal soil treatment
Soil preparation
Chemical soil treatment
Reinstallation under special permission
more
Loading category
Z 1.1 LAGA Soil
(1)
Z 1.2 LAGA Soil
(1)
Z 2 LAGA Soil
(1)
> Z 2 LAGA Soil
(1)
DK 0
(1)
DK I
(1)
DK II
(1)
DK III
(1)
> DK III
(1)
Z0 LAGA Soil
RW 2
Z 2 (term sheet)
BM0 by EBV
BM0* by EBV
more
Reference Types
Project Reference
(2)
Success Stories
Press Articles
With Media Files
Photo
(2)
Other document
(1)
Wide stage image
(2)
Video
Audio File
Presentation
Press Clipping
360° photo or tour
Portrait stage image
more
SP Company Size
10.000 and more employees
5.001-10.000 employees
1.001-5.000 employees
501-1.000 employees
201-500 employees
51-200 employees
(2)
11-50 employees
1-10 employees
Individual
more
SP Legal Forms
GmbH
(2)
GmbH & Co. KG
Einzelunternehmen
AG
UG
Eingetragener Verein (e.V.)
GbR
Nicht eingetragener Verein
Part mbB
Altrechtlicher Verein
eG
Familienstiftung
Gemeinschafts-, Dach-, Verbund- oder Bürgerstiftung
gGmbH
KG
KGaA
Kirchliche Stiftung
OHG
PartG
Privatnützige Stiftung
more
Tags
anonym
Bodensanierung
35 more filters
Hide more filters
Reset filters
Apply filters
Order by:
Relevance
Date
Datum (descending)
End date
End date (descending)
Title
Title (descending)
Reference ID
Reference ID (descending)
Select all
Add to watchlist
Compare
Recommend
2 results
within Soil Remediation Work references
LHKW-Sanierung Industriegelände Nürnberg
Max-Ottenstein-Straße,
Nürnberg
, Bavaria, Germany, Europe / since 2004
R & H Umwelt GmbH
Schnorrstraße 5A
90471
Nürnberg
Bavaria, Germany, Europe
Confirmed reference
on 05/06/2019
by Wilhelm Geiger GmbH & Co. KG, Oberstdorf
München, Friedenstreet 22b, Rhenania, i-Campus
Friedenstraße 22B,
Munich
, Bavaria, Germany, Europe / May 2019 - May 2021
Demolition, soil remediation, earthwork and sheeting work
BAUER Resources GmbH
BAUER-Straße 1
86529
Schrobenhausen
Bavaria, Germany, Europe
0 results
within Soil Remediation Work companies
Invite to Beta